Aerial view of commercial district rooftops showing building envelope in plan view
Commercial Building Inspection

Every crack. Every flaw.
On record.

We've inspected 4.2 million square feet. Yours is next.

Scroll
ASTM E2018 Compliant
Detailed Written Reports
Tagged Photographic Evidence
Commercial Only
E&O Insured
48-Hour Turnaround
4.2M Sq Ft Inspected
MEP Systems Analysis
ASTM E2018 Compliant
Detailed Written Reports
Tagged Photographic Evidence
Commercial Only
E&O Insured
48-Hour Turnaround
4.2M Sq Ft Inspected
MEP Systems Analysis
Inspection Anatomy

Six disciplines. Every layer
of the building.

Hover any discipline to see what we actually find — not stock photography, but conditions documented on real commercial properties.

Flat commercial rooftop with visible ponding water and deteriorated membrane surface under grey sky
01
High Priority

Roof Systems

Membrane, Flashing & Drainage

Ponding water, failed seams, deteriorated flashings, and inadequate slope — documented with thermal imaging and moisture probes.

Ponding water zonesFlashing failuresMembrane delamination
Close-up of commercial building foundation wall showing efflorescence streaks and masonry cracking
02
Structural

Structural Elements

Foundation, Frame & Masonry

Efflorescence, settlement cracks, lintel corrosion, and spalling concrete — graded by severity and urgency of remediation.

Settlement cracksEfflorescenceLintel corrosion
Industrial mechanical room showing aging HVAC equipment and exposed ductwork in commercial building
03
Systems

MEP Systems

Mechanical, Electrical & Plumbing

HVAC condition assessments, electrical panel evaluations, plumbing system integrity — end-of-life projections included.

HVAC age & conditionPanel capacityPipe corrosion
Thermal image of commercial building facade showing heat loss patterns around window frames in false-color display
04
Envelope

Building Envelope

Cladding, Windows & Sealants

Thermal imaging reveals heat loss at window frames. Failed sealants, cladding failures, and water infiltration pathways mapped.

Thermal bridgingSealant failureWater infiltration
Commercial building entrance showing accessible parking area and ramp access points for ADA compliance review
05
Compliance

ADA Compliance

Accessibility & Code Review

Parking ratios, ramp slopes, restroom clearances, signage — every deficiency cross-referenced against current ADA standards.

Parking ratiosRamp complianceRestroom clearances
Interior commercial space showing aged ceiling tiles and building materials that may contain asbestos or hazardous materials
06
Environmental

Environmental

Asbestos, Lead & Moisture

Suspect ACM locations, lead-based paint risk areas, and active moisture intrusion — flagged for Phase II follow-up where warranted.

ACM locationsLead paint riskMoisture mapping
4.2M

Square Feet Inspected

Across 18 states

3,800+

Reports Delivered

Since 2009

48hrs

Report Turnaround

Standard delivery

94,000+

Deficiencies Logged

Tagged and photographed

Commercial building inspection report pages spread on drafting table showing deficiency photographs and numbered findings

Inspector

Property Condition Report

Pacific Commerce Center

185,000 SF · Retail/Office Mixed Use · Portland, OR

F-014
Immediate

Roof membrane separation at parapet

F-031
Near-Term

HVAC unit #3 end of useful life

F-047
Monitor

Efflorescence at NW foundation wall

+ 61 additional findings

Avg. Findings

24.7

per inspection

Proof of Deliverable

See exactly what
you receive.

A 60-page sample report from a real 185,000 SF retail center. Every deficiency tagged, photographed, and priced. This is what protects your deal.

200+ tagged photographs per report
Every deficiency numbered and located on floor plan
Immediate vs. capital reserve cost estimates
ASTM E2018 Property Condition Assessment format
5-year capital reserve schedule included

No spam. One email with the PDF attached.

Who We Work With

Built for the people
with the most at stake.

Commercial real estate brokers reviewing property documents and inspection reports at conference table

$2.1B

Transactions supported

CRE Brokers

Close with confidence.

Due diligence timelines are tight. We deliver within 48 hours, coordinate directly with sellers, and flag anything that could crater a deal before your client is committed.

Tight due diligence windows
Seller access coordination
Lender-acceptable format

$2.1B in commercial transactions supported with condition assessments since 2009.

Start Here

Schedule your
inspection.

We respond within 2 business hours. Most inspections are scheduled within 5 days. You'll receive a fee proposal and availability confirmation by end of day.

Response within 2 business hours
Report delivered in 48 hours
E&O insured to $2M
Direct line to your inspector

Inspection Request

No commitment required

50K SF
5K SF2M SF

We respond within 2 business hours with availability and fee proposal.